Case study · María Elena, Antofagasta Region
Cerro Dominador solar thermal plant
- 10.600
- heliostats
- +700 ha
- of solar field
- Pre-commissioning and commissioning
- Electrical installation, instrumentation and control of the turbine
- Metering equipment installation and electrical connection of the panels
- Fibre optic, wifi and CCTV installation and certification
- Support with substation installation and wiring
- Professional support service, with engineers on site
Acciona Abengoa consortium